Integrating and optimizing quality and client satisfaction in resource constrained time-cost trade-off for construction projects with NSGA-III methodology
Ankit Shrivastava, Mukesh Pandey. Integrating and optimizing quality and client satisfaction in resource constrained time-cost trade-off for construction projects with NSGA-III methodology. // Asian Journal of Civil Engineering. – 2024. – DOI: 10.1007/s42107-024-01137-2. – URL: https://doi.org/10.1007/s42107-024-01137-2
Ankit Shrivastava & Mukesh Pandey (2024). Integrating and optimizing quality and client satisfaction in resource constrained time-cost trade-off for construction projects with NSGA-III methodology. Asian Journal of Civil Engineering. https://doi.org/10.1007/s42107-024-01137-2
Ankit Shrivastava and Mukesh Pandey. “Integrating and optimizing quality and client satisfaction in resource constrained time-cost trade-off for construction projects with NSGA-III methodology.” Asian Journal of Civil Engineering, 2024. doi:10.1007/s42107-024-01137-2.
@article{Shrivastava2024,
title = {Integrating and optimizing quality and client satisfaction in resource constrained time-cost trade-off for construction projects with NSGA-III methodology},
author = {Shrivastava, Ankit and Pandey, Mukesh},
journal = {Asian Journal of Civil Engineering},
year = {2024},
doi = {10.1007/s42107-024-01137-2},
url = {https://doi.org/10.1007/s42107-024-01137-2}
}