Articlium
Categories ▾
Biological Sciences›
Biological Sciences
Genetics 3379 Biological sciences 3178 Molecular Biology 2670 Biochemistry 2370 Ecology 2098 Insect Science 1560 Forestry 1509 Applied Microbiology and Biotechnology 1438 All subcategories →
Engineering and Technology›
Engineering and Technology
Mechanical Engineering 24070 Electrical and Electronic Engineering 22699 Mechanics of Materials 16488 Industrial and Manufacturing Engineering 13752 Technology and engineering 9781 Control and Systems Engineering 9249 Civil and Structural Engineering 8502 Engineering And Technology 8160 All subcategories →
Computer Science›
Computer Science
Computer science 15441 Software 9276 Artificial Intelligence 2383 Computer Networks and Communications 1898 Information Systems 1593 Computer Graphics and Computer-Aided Design 1205 Computer Science Applications 1165 General Computer Science 914 All subcategories →
Mathematics and Statistics›
Mathematics and Statistics
Mathematics 8573 Applied Mathematics 4794 General Mathematics 2674 Control and Systems Engineering 1261 Statistics and Probability 1226 Statistics, Probability and Uncertainty 1077 Theoretical Computer Science 856 Computational Mathematics 516 All subcategories →
Materials Science›
Materials Science
Materials Chemistry 3157 Surfaces, Coatings and Films 2292 Metals and Alloys 2227 Engineering (miscellaneous) 2077 Mechanical Engineering 1915 Condensed Matter Physics 1678 General Materials Science 1484 Electronic, Optical and Magnetic Materials 1482 All subcategories →
Medicine and Health Sciences›
Medicine and Health Sciences
Health sciences 25020 Surgery 15528 General Medicine 12315 Radiology, Nuclear Medicine and imaging 10755 Public Health, Environmental and Occupational Health 9681 Cardiology and Cardiovascular Medicine 9358 Orthopedics and Sports Medicine 9281 Pediatrics, Perinatology and Child Health 7546 All subcategories →
Multidisciplinary›
Multidisciplinary
Multidisciplinary 63 Modeling and Simulation 15 All subcategories →
Earth Sciences and Ecology›
Earth Sciences and Ecology
Pollution 10475 Atmospheric Science 6187 Environmental Science (miscellaneous) 5833 Water Science and Technology 5405 Geology 4972 Management, Monitoring, Policy and Law 4808 Earth and environmental sciences 3898 General Earth and Planetary Sciences 3705 All subcategories →
Psychology›
Psychology
Developmental and Educational Psychology 405 Clinical Psychology 278 Social Psychology 196 Applied Psychology 176 General Psychology 134 Experimental and Cognitive Psychology 79 Psychology (miscellaneous) 75 Arts and Humanities (miscellaneous) 70 All subcategories →
Agriculture, Biology and Veterinary Science›
Agriculture, Biology and Veterinary Science
Food Science 985 Plant Science 727 Animal Science and Zoology 600 Ecology, Evolution, Behavior and Systematics 556 Aquatic Science 433 Agronomy and Crop Science 382 Soil Science 298 General Veterinary 261 All subcategories →
Social Sciences and Humanities›
Social Sciences and Humanities
Humanities and social sciences 5519 Philosophy 3440 Education 3342 Sociology and Political Science 2505 Economics and Econometrics 1672 Geography, Planning and Development 1501 Law 1414 Social Sciences (miscellaneous) 1278 All subcategories →
Pharmaceutical Sciences and Toxicology›
Pharmaceutical Sciences and Toxicology
Pharmacology 214 Toxicology 211 Pharmaceutical Science 145 Drug Discovery 124 Pharmacology (medical) 75 Molecular Medicine 51 Bioengineering 24 Medicine (miscellaneous) 24 All subcategories →
Physics and Astronomy›
Physics and Astronomy
Astronomy and Astrophysics 330 Nuclear and High Energy Physics 314 Condensed Matter Physics 301 Atomic and Molecular Physics, and Optics 272 General Physics and Astronomy 270 Surfaces and Interfaces 149 Physics and Astronomy (miscellaneous) 70 General Engineering 65 All subcategories →
Chemistry›
Chemistry
Physical and Theoretical Chemistry 810 Organic Chemistry 698 Analytical Chemistry 694 General Chemistry 596 Spectroscopy 552 Electrochemistry 316 Chemistry (miscellaneous) 294 Inorganic Chemistry 241 All subcategories →
Economics, Finance and Business›
Economics, Finance and Business
Economics and Econometrics 2734 Business and management 1004 Finance 991 Strategy and Management 860 Management of Technology and Innovation 842 Marketing 760 Accounting 512 Business and International Management 373 All subcategories →
Energy›
Energy
Renewable Energy, Sustainability and the Environment 1708 Nuclear Energy and Engineering 670 Energy Engineering and Power Technology 503 Energy (miscellaneous) 360 Fuel Technology 317 Energy And Power 299 Mechanical Engineering 270 Control and Systems Engineering 111 All subcategories →
Journals Search Pricing Sign in
RU EN
Telegram-бот
Catalog / Engineering and Technology / Civil and Structural Engineering / Asian Journal of Civil Engineering

Asian Journal of Civil Engineering Civil and Structural Engineering

BIM-based framework to quantify delays and cost overruns due to changes in construction projects

Dhiraj Honnappa, S. P. Sreenivas Padala
Springer Nature · 2022-05-19 · DOI 10.1007/s42107-022-00451-x

The publisher did not provide an abstract — full text is available via the link below.

Read at publisher →

Share: Telegram
Journal Asian Journal of Civil Engineering
Publisher
Springer Nature
Section
Engineering and Technology
Topic
Civil and Structural Engineering
All journal articles →
Similar articles
Development of a game engine-based multi-agent model to characterize human-autonomous vehicle interactions International Journal of Transportation Science and Technology · 2027-09-01 A data-driven study on asphalt pavement roughness evolution using full-scale test track data International Journal of Transportation Science and Technology · 2027-06-01 Assessment of asphalt pavement segregation under varying construction conditions via multi-scale 3D texture analysis International Journal of Transportation Science and Technology · 2027-06-01 Evaluating the safety impacts of three-dimensional alignments of mountainous freeways using an interpretable machine learning approach International Journal of Transportation Science and Technology · 2027-06-01 Machine learning-driven impact response of discrete patterns of Al0.5CoCrFeNi with additive manufacturing and traditional melting International Journal of Impact Engineering · 2027-03-01
Telegram Get new articles on “Civil and Structural Engineering”

Subscriptions, keyword tracking and favourites — in the Articlium Telegram bot.

Open in Telegram

Citation

Dhiraj Honnappa, S. P. Sreenivas Padala. BIM-based framework to quantify delays and cost overruns due to changes in construction projects. // Asian Journal of Civil Engineering. – 2022. – DOI: 10.1007/s42107-022-00451-x. – URL: https://doi.org/10.1007/s42107-022-00451-x
Dhiraj Honnappa & S. P. Sreenivas Padala (2022). BIM-based framework to quantify delays and cost overruns due to changes in construction projects. Asian Journal of Civil Engineering. https://doi.org/10.1007/s42107-022-00451-x
Dhiraj Honnappa and S. P. Sreenivas Padala. “BIM-based framework to quantify delays and cost overruns due to changes in construction projects.” Asian Journal of Civil Engineering, 2022. doi:10.1007/s42107-022-00451-x.
@article{Honnappa2022,
  title = {BIM-based framework to quantify delays and cost overruns due to changes in construction projects},
  author = {Honnappa, Dhiraj and Padala, S. P. Sreenivas},
  journal = {Asian Journal of Civil Engineering},
  year = {2022},
  doi = {10.1007/s42107-022-00451-x},
  url = {https://doi.org/10.1007/s42107-022-00451-x}
}
Download: .bib .ris
Articlium

An open catalogue of scholarly article metadata: abstracts, authors, DOIs and ready-made citations across thousands of journals.

Catalogue Categories Journals Search Pricing
Project About Telegram-бот MAX-бот
Help Rightsholders Privacy
Customers Payment Delivery Public offer Contacts & details
© MIA-MED Information Agency, media registration certificate IA No. FS 77-55199 dated 26.08.2013 (Roskomnadzor) Metadata from open publisher sources