Dhiraj Honnappa, S. P. Sreenivas Padala. BIM-based framework to quantify delays and cost overruns due to changes in construction projects. // Asian Journal of Civil Engineering. – 2022. – DOI: 10.1007/s42107-022-00451-x. – URL: https://doi.org/10.1007/s42107-022-00451-x
Dhiraj Honnappa & S. P. Sreenivas Padala (2022). BIM-based framework to quantify delays and cost overruns due to changes in construction projects. Asian Journal of Civil Engineering. https://doi.org/10.1007/s42107-022-00451-x
Dhiraj Honnappa and S. P. Sreenivas Padala. “BIM-based framework to quantify delays and cost overruns due to changes in construction projects.” Asian Journal of Civil Engineering, 2022. doi:10.1007/s42107-022-00451-x.
@article{Honnappa2022,
title = {BIM-based framework to quantify delays and cost overruns due to changes in construction projects},
author = {Honnappa, Dhiraj and Padala, S. P. Sreenivas},
journal = {Asian Journal of Civil Engineering},
year = {2022},
doi = {10.1007/s42107-022-00451-x},
url = {https://doi.org/10.1007/s42107-022-00451-x}
}