Peng Yan, Xi Yang, Yunpeng Zhang, Shanying Hou, Deqing Gan. Millisecond Delay Time Optimization and Its Effect on Blasting Vibration Reduction in an Open Pit Mine. // Rock Mechanics and Rock Engineering. – 2026. – DOI: 10.1007/s00603-026-05321-5. – URL: https://doi.org/10.1007/s00603-026-05321-5
Peng Yan, Xi Yang, Yunpeng Zhang, Shanying Hou, & Deqing Gan (2026). Millisecond Delay Time Optimization and Its Effect on Blasting Vibration Reduction in an Open Pit Mine. Rock Mechanics and Rock Engineering. https://doi.org/10.1007/s00603-026-05321-5
Peng Yan, et al. “Millisecond Delay Time Optimization and Its Effect on Blasting Vibration Reduction in an Open Pit Mine.” Rock Mechanics and Rock Engineering, 2026. doi:10.1007/s00603-026-05321-5.
@article{Yan2026,
title = {Millisecond Delay Time Optimization and Its Effect on Blasting Vibration Reduction in an Open Pit Mine},
author = {Yan, Peng and Yang, Xi and Zhang, Yunpeng and Hou, Shanying and Gan, Deqing},
journal = {Rock Mechanics and Rock Engineering},
year = {2026},
doi = {10.1007/s00603-026-05321-5},
url = {https://doi.org/10.1007/s00603-026-05321-5}
}