Tengteng Hao, Kaili Xu, Xin Zheng, Jishuo Li, Haojie Wang. A tailings dam displacement interval prediction model based on time series decomposition and an improved Elman neural network model. // Stochastic Environmental Research and Risk Assessment. – 2025. – DOI: 10.1007/s00477-025-03108-8. – URL: https://doi.org/10.1007/s00477-025-03108-8
Tengteng Hao, Kaili Xu, Xin Zheng, Jishuo Li, & Haojie Wang (2025). A tailings dam displacement interval prediction model based on time series decomposition and an improved Elman neural network model. Stochastic Environmental Research and Risk Assessment. https://doi.org/10.1007/s00477-025-03108-8
Tengteng Hao, et al. “A tailings dam displacement interval prediction model based on time series decomposition and an improved Elman neural network model.” Stochastic Environmental Research and Risk Assessment, 2025. doi:10.1007/s00477-025-03108-8.
@article{Hao2025,
title = {A tailings dam displacement interval prediction model based on time series decomposition and an improved Elman neural network model},
author = {Hao, Tengteng and Xu, Kaili and Zheng, Xin and Li, Jishuo and Wang, Haojie},
journal = {Stochastic Environmental Research and Risk Assessment},
year = {2025},
doi = {10.1007/s00477-025-03108-8},
url = {https://doi.org/10.1007/s00477-025-03108-8}
}