R. Karthick, G. R. Iyappan, D. Elango, P. Sangeetha. Fuzzy logic-based decision support framework for managing change order impacts in construction projects. // Asian Journal of Civil Engineering. – 2026. – DOI: 10.1007/s42107-026-01780-x. – URL: https://doi.org/10.1007/s42107-026-01780-x
R. Karthick, G. R. Iyappan, D. Elango, & P. Sangeetha (2026). Fuzzy logic-based decision support framework for managing change order impacts in construction projects. Asian Journal of Civil Engineering. https://doi.org/10.1007/s42107-026-01780-x
R. Karthick, et al. “Fuzzy logic-based decision support framework for managing change order impacts in construction projects.” Asian Journal of Civil Engineering, 2026. doi:10.1007/s42107-026-01780-x.
@article{Karthick2026,
title = {Fuzzy logic-based decision support framework for managing change order impacts in construction projects},
author = {Karthick, R. and Iyappan, G. R. and Elango, D. and Sangeetha, P.},
journal = {Asian Journal of Civil Engineering},
year = {2026},
doi = {10.1007/s42107-026-01780-x},
url = {https://doi.org/10.1007/s42107-026-01780-x}
}