Ahmed Missaoui, Cemalettin Ozturk, Barry O’Sullivan. Energy-Aware Blocking Hybrid Flow Shop Scheduling Problem with Sequence-depend Setup Times and Machine Speed Levels. // Procedia Computer Science. – 2025. – DOI: 10.1016/j.procs.2025.01.175. – URL: https://doi.org/10.1016/j.procs.2025.01.175
Ahmed Missaoui, Cemalettin Ozturk, & Barry O’Sullivan (2025). Energy-Aware Blocking Hybrid Flow Shop Scheduling Problem with Sequence-depend Setup Times and Machine Speed Levels. Procedia Computer Science. https://doi.org/10.1016/j.procs.2025.01.175
Ahmed Missaoui, et al. “Energy-Aware Blocking Hybrid Flow Shop Scheduling Problem with Sequence-depend Setup Times and Machine Speed Levels.” Procedia Computer Science, 2025. doi:10.1016/j.procs.2025.01.175.
@article{Missaoui2025,
title = {Energy-Aware Blocking Hybrid Flow Shop Scheduling Problem with Sequence-depend Setup Times and Machine Speed Levels},
author = {Missaoui, Ahmed and Ozturk, Cemalettin and O’Sullivan, Barry},
journal = {Procedia Computer Science},
year = {2025},
doi = {10.1016/j.procs.2025.01.175},
url = {https://doi.org/10.1016/j.procs.2025.01.175}
}