Xiaohua Peng, Bo Yang, Xingbin Li, Xingzheng Dai, Chang Wei, Zhanqing Lu et al. Iron Removal from Zinc Leaching Solution with High Sulfate Concentration via Hydrothermal Mineralization Precipitation at 150−160°C. // JOM. – 2025. – DOI: 10.1007/s11837-025-07546-1. – URL: https://doi.org/10.1007/s11837-025-07546-1
Xiaohua Peng, Bo Yang, Xingbin Li, Xingzheng Dai, Chang Wei, Zhanqing Lu, Zhigan Deng, & Minting Li (2025). Iron Removal from Zinc Leaching Solution with High Sulfate Concentration via Hydrothermal Mineralization Precipitation at 150−160°C. JOM. https://doi.org/10.1007/s11837-025-07546-1
Xiaohua Peng, et al. “Iron Removal from Zinc Leaching Solution with High Sulfate Concentration via Hydrothermal Mineralization Precipitation at 150−160°C.” JOM, 2025. doi:10.1007/s11837-025-07546-1.
@article{Peng2025,
title = {Iron Removal from Zinc Leaching Solution with High Sulfate Concentration via Hydrothermal Mineralization Precipitation at 150−160°C},
author = {Peng, Xiaohua and Yang, Bo and Li, Xingbin and Dai, Xingzheng and Wei, Chang and Lu, Zhanqing and Deng, Zhigan and Li, Minting},
journal = {JOM},
year = {2025},
doi = {10.1007/s11837-025-07546-1},
url = {https://doi.org/10.1007/s11837-025-07546-1}
}