Citation
Jikun Sun. Application of Graph Convolutional Neural Network (GCN) in Critical Path Identification for Engineering Schedule Networks. // Procedia Computer Science. – 2026. – DOI: 10.1016/j.procs.2026.07.176. – URL: https://doi.org/10.1016/j.procs.2026.07.176
Jikun Sun (2026). Application of Graph Convolutional Neural Network (GCN) in Critical Path Identification for Engineering Schedule Networks. Procedia Computer Science. https://doi.org/10.1016/j.procs.2026.07.176
Jikun Sun. “Application of Graph Convolutional Neural Network (GCN) in Critical Path Identification for Engineering Schedule Networks.” Procedia Computer Science, 2026. doi:10.1016/j.procs.2026.07.176.
@article{Sun2026,
title = {Application of Graph Convolutional Neural Network (GCN) in Critical Path Identification for Engineering Schedule Networks},
author = {Sun, Jikun},
journal = {Procedia Computer Science},
year = {2026},
doi = {10.1016/j.procs.2026.07.176},
url = {https://doi.org/10.1016/j.procs.2026.07.176}
}