Thomas Bömer, Max Disselnmeyer, Anne Meyer. A Constraint Programming Approach for the Multi-Robot Multibay Unit Load Pre-marshalling Problem. // Procedia CIRP. – 2025. – DOI: 10.1016/j.procir.2025.02.151. – URL: https://doi.org/10.1016/j.procir.2025.02.151
Thomas Bömer, Max Disselnmeyer, & Anne Meyer (2025). A Constraint Programming Approach for the Multi-Robot Multibay Unit Load Pre-marshalling Problem. Procedia CIRP. https://doi.org/10.1016/j.procir.2025.02.151
Thomas Bömer, et al. “A Constraint Programming Approach for the Multi-Robot Multibay Unit Load Pre-marshalling Problem.” Procedia CIRP, 2025. doi:10.1016/j.procir.2025.02.151.
@article{Bmer2025,
title = {A Constraint Programming Approach for the Multi-Robot Multibay Unit Load Pre-marshalling Problem},
author = {Bömer, Thomas and Disselnmeyer, Max and Meyer, Anne},
journal = {Procedia CIRP},
year = {2025},
doi = {10.1016/j.procir.2025.02.151},
url = {https://doi.org/10.1016/j.procir.2025.02.151}
}