Track–bridge interaction for a railway bridge with longitudinally movable track
Marc Wenner, Sebastian Plica, Robert Rödert, Khadijah Basamad, Marcus Zeckert, Michael Missler, Peter Lippert
Elsevier ·
2026-01-01
· DOI 10.1016/j.prostr.2026.07.053
The publisher did not provide an abstract — full text is available via the link below.
Marc Wenner, Sebastian Plica, Robert Rödert, Khadijah Basamad, Marcus Zeckert, Michael Missler et al. Track–bridge interaction for a railway bridge with longitudinally movable track. // Procedia Structural Integrity. – 2026. – DOI: 10.1016/j.prostr.2026.07.053. – URL: https://doi.org/10.1016/j.prostr.2026.07.053
Marc Wenner, Sebastian Plica, Robert Rödert, Khadijah Basamad, Marcus Zeckert, Michael Missler, & Peter Lippert (2026). Track–bridge interaction for a railway bridge with longitudinally movable track. Procedia Structural Integrity. https://doi.org/10.1016/j.prostr.2026.07.053
Marc Wenner, et al. “Track–bridge interaction for a railway bridge with longitudinally movable track.” Procedia Structural Integrity, 2026. doi:10.1016/j.prostr.2026.07.053.
@article{Wenner2026,
title = {Track–bridge interaction for a railway bridge with longitudinally movable track},
author = {Wenner, Marc and Plica, Sebastian and Rödert, Robert and Basamad, Khadijah and Zeckert, Marcus and Missler, Michael and Lippert, Peter},
journal = {Procedia Structural Integrity},
year = {2026},
doi = {10.1016/j.prostr.2026.07.053},
url = {https://doi.org/10.1016/j.prostr.2026.07.053}
}