Hui Zhang, Wei-Peng Zhou, Peng-Ju Si. Modeling Production Planning for Hull Sub-assemblies in Shipbuilding: A Dependent Parallel Machine Scheduling Problem with Limited Buffer Capacity. // Journal of the Operations Research Society of China. – 2026. – DOI: 10.1007/s40305-026-00729-w. – URL: https://doi.org/10.1007/s40305-026-00729-w
Hui Zhang, Wei-Peng Zhou, & Peng-Ju Si (2026). Modeling Production Planning for Hull Sub-assemblies in Shipbuilding: A Dependent Parallel Machine Scheduling Problem with Limited Buffer Capacity. Journal of the Operations Research Society of China. https://doi.org/10.1007/s40305-026-00729-w
Hui Zhang, et al. “Modeling Production Planning for Hull Sub-assemblies in Shipbuilding: A Dependent Parallel Machine Scheduling Problem with Limited Buffer Capacity.” Journal of the Operations Research Society of China, 2026. doi:10.1007/s40305-026-00729-w.
@article{Zhang2026,
title = {Modeling Production Planning for Hull Sub-assemblies in Shipbuilding: A Dependent Parallel Machine Scheduling Problem with Limited Buffer Capacity},
author = {Zhang, Hui and Zhou, Wei-Peng and Si, Peng-Ju},
journal = {Journal of the Operations Research Society of China},
year = {2026},
doi = {10.1007/s40305-026-00729-w},
url = {https://doi.org/10.1007/s40305-026-00729-w}
}